S/N | Project Title | Project Description | Contract Type (DED, ESA, EPC, FEED etc.) | Client | Period of Execution | Project ManHours | Project Status |
1. | Design for Installation of an XHP Separator at Alakiri Flow station | Provision of a design solution for the routing of XHP gas wells from the Alakiri Gas plant to the Alakiri Flowstation for processing using an XHP separator to be relocated from CAWC3 Flowstation | Detailed Engineering Design |
Eroton Exploration & Production Company Ltd. |
July. 2018 – Sept. 2018 | 1112 MHrs | Completed |
2. | Provision of Consultancy and Project Management Services for Odidi-Warri Gas expansion project (OWEP) | Provision of Project Coordination, Project Management, Monitoring, controlling, Verification and Validation of work executed by EPC contractor in Partnership with SYBAG limited. | Consultancy/ Project Management |
Nigerian National Petroleum Corporation (NNPC) |
May 2018- Dec. 2019 | 128,000 MHrs (Proposed) | Ongoing |
3. | UNIUYO Engineering Complex Project | Detailed Architectural and Engineering Design for Engineering complex
2-floor Engineering complex and 1 Stand Alone Workshop at the main campus of University of Uyo |
Detailed Engineering Design |
Mobil Producing Nigeria Unlimited |
April. 2018 – July 2018 | 3900 MHrs | Completed |
4. | Provision of Project Site management support for LACT Unit Installation | Provision of Project management support for LACT Unit Installation | Project Management |
Eroton Exploration & Production Company Ltd. |
Mar. 2018 – Jun. 2018 | 864 MHrs | Completed |
5. | Integrated Facility Management Project–Phase 2 | Facilities Baseline Data Development
SECTION 2 |
Data development and As-Built |
Mobil Producing Nigeria Unlimited
|
Mar. 2018 – Nov. 2018 | 3510 MHrs | Completed |
6. | Bonny River Terminal (BRT) Exposed Pipeline Remediation |
Hydrological Study for BRT Exposed Pipeline Remediation
|
Hydrological Studies |
Mobil Producing Nigeria Unlimited |
Mar. 2018 – Aug. 2018 | 1125 MHrs | Completed |
7. | Cawthorne channel 1 to Cawthorne channel 2 Alternative Crude evacuation Pipeline Project | Provision of Conceptual studies and Front End Engineering Design | Conceptual Studies/ Front End Engineering Design |
Eroton Exploration & Production Company Ltd. |
Feb. 2018 – May. 2018 | 1328 MHrs | Completed |
8. | Awoba-Krakama-Cawthorne channel 3 Alternative Crude evacuation Pipeline Project | Provision of Conceptual studies and Front End Engineering Design | Conceptual Studies/ Front End Engineering Design |
Eroton Exploration & Production Company Ltd. |
Jan. 2018 – May. 2018 | 1328 MHrs | Completed |
9. | JV Structural Repair Project for Inim, Enang and Utue Platforms | Brownfield Verification of Corroded structural members for Inim, Enang and Utue Platforms | Brown Field verification and Production of Bill of materials for Construction |
Mobil Producing Nigeria Unlimited
|
Dec. 2017 – April. 2018 | 1125 MHrs | Completed |
10. | Alakiri Associated Gas solutions Conceptual Studies | Provision of Conceptual Studies for Alakiri Associated Gas solutions | Conceptual Studies |
Eroton Exploration & Production Company Ltd.
|
Nov. 2017 – Dec. 2017 | 1328 MHrs | Completed |
11. | Project management and Support Services for Alternative Crude Oil Export system Pipeline Project (ACOES) | Provision of Project management for Alternative Crude Oil Export system Pipeline Project (ACOES) | Project Management |
Eroton Exploration & Production Company Ltd.
|
Oct. 2017 – Dec. 2017 | 264 MHrs | Completed |
12. | 20 MW Natural Gas Cogeneration Power Plant Development at Amuwo Odofin, Lagos State, Nigeria | Feasibility Studies for 20 mega watts natural gas Power Plant | Feasibility Studies |
BCH Sustainable Energy Partners |
Sep. 2017 – Dec. 2017 | 174 MHrs | Completed |
13. | LPG Extraction Plant Project (Pipeline Scope) | Detailed Engineering Design for LPG Extraction plant targeted at extracting LPG, Propane & Condensate Products from rich associated gas |
(EPC) Detailed Engineering Design |
Green Energy International Limited/Lekoil JV, Lambda gas Dynamics Limited, PCC |
Sep. 2017 – April. 2018 (Detailed Engineering) |
2270 MHrs (Detailed Engineering) | Completed |
14. | Engineering Design Support for Procurement and Installation of Gas Lift System | Provision of Engineering Support for the procurement and Installation of gas Lift System for Alakiri and Cawthorne Channels Fields | Follow-On Engineering |
Eroton Exploration & Production Company Ltd. |
Aug. 2017 – Dec. 2017 | 696 MHrs | Completed |
15. | OML 99 Pig Receiver Drain Pan Overboard Scaffold Design | Detailed Design for Overboard Scaffold Design for Pig Receiver Drain Pan on OML 99 | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
Aug. 2017 – Oct. 2017 |
314 MHrs
|
Completed |
16. | AFD1 13-ESDV-340 Scaffold Design | AFD1 13-ESDV-340 Scaffold Design | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
Aug. 2017 – Sep. 2017 |
117 MHrs
|
Completed |
17. | 28-ES-3040 (A & B) Load bearing Scaffold Design | Scaffold Design Load bearing for 28-ES-3040
(A & B) |
Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
May. 2017 – June 2017 |
234 MHrs
|
Completed |
18. | Engineering Design of OML 100 (FSO Unity) Emergency RADA Works Scaffold Design | Engineering Design of OML 100 (FSO Unity) Emergency RADA Works Scaffold Design | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
Feb. 2017 –April. 2017 |
187 MHrs
|
Completed |
19. | Engineering Design of OML 102 (OFON) boat surfer landing scaffold | Detailed Engineering Design for of OML 102 (OFON) boat surfer landing scaffold | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
Jan. 2017 – Mar. 2017 |
115 MHrs
|
Completed |
20. | Engineering Design for Conceptual study and FEED for Alakiri NAG condensate Storage Tank facility | Provision of Feasibility study and FEED for Alakiri Non Associated Gas (NAG) condensate Storage Tank facility | Feasibility Studies/ Front End Engineering Design |
Eroton Exploration & Production Company Ltd. |
Jan. 2017 – April. 2017 | 4847 MHrs | Completed |
21. | Award of Contract for Consultancy Services for the Design of ADIM ABARIBA road, BIASE L.G.A in Cross River State | Provision Consultancy Services for the Design of ADIM ABARIBA road, BIASE L.G.A in Cross River State | Consultancy |
Ministry Of Niger Delta Affairs |
Jan. 2017 – Mar. 2017 | 1272 MHrs | Completed |
22. | Award of Contract for Consultancy Services for the Design of Internal Road Network NKO, YAKURR L.G.A in Cross River State | Provision Consultancy Services for the Design of Internal Road Network NKO, YAKURR L.G.A in Cross River State | Consultancy |
Ministry Of Niger Delta Affairs |
Jan. 2017 – Mar. 2017 | 1331 MHrs | Completed |
23. | Project Support Services | Provision of Project Support Services | Engineering Service Agreement |
Shell Petroleum Development Company of Nigeria Limited |
Jan 2017 – Jun. 2019 | Contract Ceiling Applicable | Projects are Ongoing on the ESA |
24. | Engineering Design Service Agreement for Various MPN Projects (ESA III) | Provision of Engineering Services in performing Conceptual, Preliminary and Detailed Engineering, Integrity Management, Project Engineering Support, Procurement Technical Support | Engineering Service Agreement |
Mobil Producing Nigeria Unlimited |
Nov 2016 – Nov 2019 | Contract Ceiling Applicable | Projects are Ongoing on ESA III |
25. | Engineering Design for Gas Lift for Alakri, Orubiri, Cawthorne Channel and Akaso fileds | Provision of Detailed Engineering Design of Gas Lift for Alakri, Oribiri, Cawthorne Channel and Akaso fileds | Detailed Engineering Design |
Eroton Exploration & Production Company Ltd. |
Oct 2016 – December 2016 | 1669 MHrs | Completed |
26. | Engineering Design Service Agreement for OML 18 | Provision of Engineering Design Service for various work packages on OML 18 for Three Years | Engineering Service Agreement |
Eroton Exploration & Production Company Ltd. |
Jun 2016 – Jun 2019 | Contract Ceiling Applicable | Projects are Ongoing on the ESA |
27. | Escravos Export System Project | Provision of Detailed Engineering Design of the Chevron Nigeria Limited Escravos export system on the Escravos Tank farm facility | Detailed Engineering Design |
Gramen Petroserve Nig Ltd./ Chevron Nigeria Limited (CNL) |
May 2016 – April 2017 | 34,765
MHrs |
Completed |
28. | Implementation of Corrosion Inhibitor Injection on HP Production Header on AMD2 (phase 2) | Detailed Engineering Design for the Implementation of corrosion inhibitor injection on HP production header on Amenam Drilling platform 2. | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited
|
Sep. 2015 – Dec 2015 |
1800 MHrs |
Completed |
29. | Conversion of Well AMKP2-40 from water injector to oil producer | Detailed engineering Design of AMKP2-40 as a water injector, connected to AMD 2 Water Injection manifold via 6” 1500# carbon steel flow line and replacement of Christmas tree with new oil production tree. | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
Sep. 2015 – Dec 2015 |
868 MHrs |
Completed |
30. | Supply of various
Engineering Personnel for SPDC ODIDI Project |
Provision of Engineering
Personnel (1 Process, 1 Loss Prevention and Control, 1 Stress Analysis Engineers) for ODIDI project |
Detailed Engineering Design |
Desicon Engineering Limited/ Shell Petroleum Development Company of Nigeria Limited |
May 2016 – May 2017 |
8068 MHrs |
Completed |
31. | Frame Agreement Contract For Engineering Studies And Design | Engineering Services agreement for call-up contracts | Frame Agreement |
Total Upstream Nigeria Limited |
Aug. 2015 – July 2016 | Contract Ceiling Applicable | Completed |
32. | Stress Analysis For Akpo Offloading Lines | Detailed Engineering studies of Piping Stress Analysis and Report For Akpo Offloading Lines | Detailed Engineering Design |
Total Upstream Nigeria Limited |
Jun. 2015 – July 2015 | 284 MHrs | Completed |
33. | ANGO Pipelines Project | DED of Two wellhead platform with two dual string hook up arms & equipment | Detailed Engineering Design |
CONOIL/MSI Africa Ltd. /Greenstone Solution |
Jan. 2015 – April 2015 |
3,419 MHrs |
Completed |
34. | UFR Package of EGINA FPSO | Detailed Engineering Design of UFR package in a joint team with Saipem. | Detailed Engineering Design |
SAIPEM Contracting Nig. Ltd/ Total Upstream Nigeria Limited |
July 2013 – June 2015 |
45,000 MHrs (KOHASA scope) |
Completed |
35. | OML 100 FSO UNITY OWT JASCON 1 Barge Stability Analysis | Detailed Engineering of barge stability and analysis to validate the stability of the JASCON 1 barge for the transportation of the FSO OWT module. | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited
|
May 2013 – June 2013 | 3200 MHrs | Completed |
36. | MCC and Workshop Building , Meji Living Quarter Project | Detailed Engineering Design for Motor control Center and Workshop building of the Meji Living Quarter platform | Detailed Engineering Design |
WECO Eng. & Const Co./ Chevron Nigeria Limited |
May 2013 – Sept. 2013 |
4,852 MHrs |
Completed |
37. | EPC of Air Tugger Platform | Detailed Engineering Design of Air Tugger platform Skid on BE802 main deck | Detailed Engineering Design |
TILONE Subsea/ Hallin Marine |
April 2013 – May 2013 |
522 MHrs |
Completed |
38. | Engineering for RDS Skids on vessel BE 802 | Detailed Engineering Design for RDS Skids on vessel BE 802 | Detailed Engineering Design | TILONE Subsea/ Hallin Marine | Feb. 2013 – Mar. 2013 |
302 MHrs |
Completed |
39. | OML 100, FSO Unity Overboard Discharge Line Replacement with GRP | Detailed Engineering for OML 100 FSO Unity overboard discharge line replacement from Carbon steel to Glass Reinforced Plastic | Detailed Engineering Design |
African Star Energy Services Ltd. |
Feb. 2013 – Dec. 2013 | 1,875 MHrs | Completed |
40. | OML58 Fresh Water Network Improvement (Phase 1) | Detailed Engineering Design for OML 58, Obagi Flow Station Fresh Water network Improvement | Detailed Engineering Design | Vicbriggs Nigeria Ltd./ Total Exploration & Production Nigeria Limited
|
Jan. 2013 – Jun 2013 |
2,125 M-Hrs |
Completed |
41. | Mezzanine Deck Strength Assessment Services (vessel BE 802) | Deatailed Engineering design of mezzanine deck amendment on Vessel BE 802 | Detailed Engineering Design |
TILONE Subsea/ Hallin Marine
|
Jan. 2013 – Feb. 2013 |
175 MHrs |
Completed |
42. | NOPL Project Control Building and Guard Houses. | Detailed Engineering Design of Northern Option Pipeline Project Control Building and Guard Houses. | Detailed Engineering Design |
CICO Construction Limited / SAIPEM Contr. Nig. Ltd/ Total Exploration & Production Nigeria Limited |
Jan. 2013 – Dec. 2013 |
18,750 MHrs |
Completed |
43. | 24” Gas Pipeline from Ogbainbiri to OB/OB (Replacement of damaged sections) | Detailed Engineering Design for 24” Gas Pipeline from Ogbainbiri to OB/OB (Replacement of damaged sections) | Detailed Engineering Design |
TOPLINE Ltd./ DAEWOO Nig. Ltd./ Nigerian Agip Oil Company (NAOC) |
Oct. 2012 – May 2013 |
4,448 MHrs |
Completed |
44. | OML 58: OLO Flare tip replacement | Detailed Engineering Design of OLO Flare Tip replacement and Project Management. | Detailed Engineering Design |
Asbury Intl. Ltd/ Total Exploration & Production Nigeria Limited |
Sep. 2012 – Nov 2012 | 2,240 MHrs | Completed |
45. | Engineering Service Agreement FOR SSAGS PROJECT | Provision of Engineering Personnel for Detailed Engineering of Southern Swamp Associated Gas Solutions Project | Engineering Service Agreement | SAIPEM contr. Nig. Ltd/ Shell Petroleum Development Company | Aug 2012 – June 2016 | 176,000 MHrs (KOHASA scope) | Completed |
46. | OML 99 AMQ Helideck Upgrade Project | Detailed Engineering for OML 99 AMQ Helideck Upgrade covering: Preparation of Structural Engineering basis of design STAAD Pro model for analysis and Design verification and reports *IFC drawings | Detailed Engineering Design |
Asbury Intl. Ltd/ Total Exploration & Production Nigeria Ltd. |
Feb. 2012 – May 2012 | 1,080 MHrs | Completed |
47. | OSV LewekTuckan Upgrade | Provision of Structural Engineering calculations and drawings for the installation of Reel Hub Drive and Overboarding chute Base. | Detailed Engineering Design |
Tilone Subsea/ TOTAL Upstream Nig. Ltd
|
May 2012 – July 2012 | 982 MHrs | Completed |
48. | Flowlines Sectional Replacement at the East and West Corner of Ogbogu Flow Station | Detailed Engineering Design of Flow Line Sectional Replacement at the East and West Corner of OGBOGU Flow Station | Basic Engineering Design |
Total Exploration & Production Nigeria Limited |
Jan. 2012 – June 2012 |
7,200 MHrs |
Completed |
49. | OML99 Lightning Protection Upgrade on AMQ and AMP2. | Basic Engineering Design Studies:
Provision of 2 point support of 2m (minimum)•Relocation of the existing ION Plasma generator on AMP2 electrical building to an elevation of at least 2m above the highest structure on AMQ2 above the radar located on AMQ telecom mast, and the provision of lightning protection for the radar. |
Front End Engineering Design |
Total Exploration & Production Nigeria Limited |
Aug. 2011 – Sep. 2011 | 1,876 MHrs | Completed |
50. | OML 58 Obagi F/S PECO filter installation for GPS and old NPS | Basic Engineering Studies, for the installation of the PECO filter on each of the fuel gas lines to the five oil expedition pumps | Basic Engineering Design |
Total Exploration & Production Nigeria Limited |
May 2011 – Jul. 2011 |
1,200 MHrs |
Completed |
51. | OML58 Compact Prover Installation at Rumuekpe Metering Station- Basic Engineering. | Basic Engineering Studies for 16” bi-directional Prover loop that was no-longer in operation and install a new Compact Prover with required appurtenances. | Basic Engineering Design |
Total Exploration & Production Nigeria Limited |
May 2011 – Jul. 2011 |
2,840 MHrs
|
Completed |
52. | OML100 Re-instate Accessibility to South-East Boat landing on Edikan Drilling Platform1-EDD1 | Basic Engineering Design Studies :
Relocation of existing boat landing on the southern East of the jacket to the North East corner of the platform |
Basic Engineering Design |
Total Exploration & Production Nigeria Limited |
April 2011 – June 2011 | 1520 MHrs | Completed |
53. | Engineering for the Installation of Handrails, stoppers, and monorail with hoist at AMP1 | Conversion of the North-West area of the weather deck on AMP1 to have additional storage space for chemicals and lubricants. The new storage area shall be provided with steel drum storage with a capacity for the storage of 60 drums when completed. | Detailed Engineering Design |
Total Exploration & Production Nigeria Limited |
Jan. 2011 – Mar. 2011 | 1,850 MHrs | Completed |
54. | Design of an Air Cooled Heat Exchanger Structural support in IMA Field, Langley. | Design of an Air Cooled Heat Exchanger Structural support | Detailed Engineering Design | Chesroc Nigeria Limited | Dec. 2010 – Feb. 2011 | 762 MHrs | Completed |
55. | OML58 OB 090 Temporary Retention Pit | Basic Engineering studies for Temporary Retention Pit used for the storage of drill cut with a 10,000m3 storage capacity. | Basic Engineering Design |
Total Exploration & Production Nigeria Limited |
Nov. 2010 – Jan. 2011 | 960 MHrs | Completed |
56. | Technical Assistance – Drafting Services in Support of TUPNI DW ECP Group | Call-up Contract for Drafting and Technical Services to update COMPANY drawings according to mark-ups | Engineering Service Agreement |
Total Upstream Nigeria Limited |
Oct. 2010 – Mar. 2011 |
17,477 MHrs |
Completed |
57. | Frame Agreement for Engineering Services
(OML 58 Upgrade Phase 1 Project) |
Provision of Engineering Personnel for the detailed Engineering of Obite Treatment Centre, Obagi Flow Station, Ogbogu clusters. | Engineering Service Agreement |
SAIPEM Nontracting Nig. Ltd/ Total Exploration & Production Nigeria Limited |
July 2009 – Dec 2015 |
38,092.09 MHrs (KOHASA personnel scope) |
Completed |