ENGINEERING DESIGN SERVICE AGREEMENTS BY KOHASA ENGINEERING COMPANY LIMITED

S/N

Project

Description

Contract Type (ESA, EPCM, etc.)

Client

Period of Execution

Comment (Completed/Ongoing)

 

 

1

Engineering Design Services (PURE SERVICES)

Provision of Project Support Services

 

ESA

Shell Petroleum Development Company of Nigeria Limited

 

July 2022- March 2024

Contract Ongoing

 

 

 

i

Bonny Production Unit As Built.

Bonny Production Unit As Built.

DED

Shell Petroleum Development Company of Nigeria Limited

 

June 2024- August 2024

Contract Ongoing

 

 

ii

Jetties Structural Integrity Assessment & Determination of Safe Working Load (SWL)

Jetties Structural Integrity Assessment & Determination of Safe Working Load (SWL)

DED

 

Shell Petroleum Development Company of Nigeria Limited

 

 

May2024

July,2024

Contract Ongoing

 

 

 

iii

EDS SOW for PMC Services

EDS SOW for PMC Services

DED

 

Shell Petroleum Development Company of Nigeria Limited

 

 

March 2024 – March 2026

Contract Ongoing

 

 

 

iv

EDS GBARAN Liquid Storage Tank

EDS GBARAN Liquid Storage Tank

 

 

DED

Shell Petroleum Development Company of Nigeria Limited

 

 

Nov 2023- May 2024

 

Contract Ongoing

 

 

 

v

EDS Tunu AGO Additional Scope Asses

EDS Tunu AGO Additional Scope Asses

 

DED

Shell Petroleum Development Company of Nigeria Limited

 

 

Dec 2023- March 2024

 

 

Completed

 

vi

Terminal Rejuv Project (Scope Ass)

Terminal Rejuv Project (Scope Ass)

ESA

Shell Petroleum Development Company of Nigeria Limited

 

 

May 2023 -June 2023

 

 

Completed

 

vii

EDS Escrav Beach FS Diesel Tank

EDS Escrav Beach FS Diesel Tank

DED

Shell Petroleum Development Company of Nigeria Limited

 

 

Aug 2023 – Sept 2023

 

Completed

 

viii

EDS Tunu AGO Tanks Integration Asses

EDS Tunu AGO Tanks Integration Asses

DED

Shell Petroleum Development Company of Nigeria Limited

 

 

Nov 2023- Dec 2023

 

 

Completed

2

Project Support Services

Provision of Project Support Services

ESA

Shell Petroleum Development Company of Nigeria Limited

Jan 2017 – June. 2022

Completed

i.

Engineering Service Agreement FOR SSAGS PROJECT

Provision of Engineering Personnel for Detailed Engineering of Southern Swamp Associated Gas Solutions Project

ESA

Shell Petroleum Development Company/SAIPEM contr. Nig. Ltd

Aug 2012 – June 2016

Completed

 

 

 

3

Provision of Engineering Services

Provision of Engineering Services

 

 

 

 

ESA

 

 

 

Nigeria Agip Oil Company (NAOC)

 

 

 

 

 

Jan 2023 -Jan 2025

 

 

 

 

Contract Ongoing

 

 

 

i.

Buckled Ob/Ob 10″ And 8″ Pipeline Investigation, Analysis And Report

Buckled Ob/Ob 10″ And 8″ Pipeline Investigation, Analysis And Report

 

Pipeline Investigation

Analysis/Report.

Nigeria Agip Oil Company (NAOC)

 

 

 

July 2023- August 2023

 

Completed

 

 

 

 

 

4

Engineering Design Service Agreement for Various NPDC/ND WESTERN OML 34 Asset Management Team (RENEWAL-1 Year)

Provision of Engineering Services in performing Conceptual, Preliminary and Detailed Engineering, Integrity Management, Project Engineering Support, Procurement Technical Support and Construction/Installation Support Services.

ESA

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

Jun. 2021- Jun. 2023;

Completed

 

 

 

i

Engineering Design, Procurement, Fabrication and Installation Of Chemical Injection Pumps At Utorogu Well 38T,33T,35T.

Engineering Design, Procurement, Fabrication and Installation Of Chemical Injection Pumps At Utorogu Well 38T,33T,35T.

ESA

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

April 2024

July 2024

Contract Ongoing

 

ii

OML 34 JV Flare Gas Monetization Study

OML 34 JV Flare Gas Monetization Study

Conceptual/ Feasibility Studies

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

 

 

 

March 2023

 

 

 

 

Completed

iii

Engineering Design for the Installation, Hook-up to Existing Facilities & Commissioning of New 5MMSCFD Gas lift Compressor Package for UGHE Field

Engineering Design for the Installation, Hook-up to Existing Facilities & Commissioning of New 5MMSCFD Gas lift Compressor Package for UGHE Field in OML34

Conceptual/ Feasibility Studies

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

 

 

 

 

Feb 2023 –

 

 

 

 

Completed

iv

Ughelli-East Well 9 Drilling Location

Completion of outstanding critical works in Ughelli-East Well 9 Drilling Location

Conceptual/ Feasibility Studies

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

Dec 2022

 

 

 

 

Completed

v

Engineering Design for site preparation works of well drilling location at UTORGU field of OML34

Engineering Design For Site Preparation Works Of Well Drilling Location At UTORGU Field Of OML34

Conceptual/ Feasibility Studies

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

Dec 2022

 

 

 

 

Completed

vi

Pre-Start Up Audit for Replacement Of 10”X12KM UTOROGU to UPS Pipeline Using Horizontal Directional Drilling (HDD)

Pre-Start Up Audit for Replacement Of 10”X12KM UTOROGU to UPS Pipeline Using Horizontal Directional Drilling (HDD)

Conceptual/ Feasibility Studies

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

 

Sept 2022

 

 

 

 

Completed

vii

Gas Sweetening Solution for Utorogu Field Gas Streams

Conceptual/Feasibility studies for short term, medium term and long-term solutions of removal of CO2 from sales gas stream

Conceptual/ Feasibility Studies

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

 

April 2022- Jun. 2022

 

 

 

 

 

 

Completed

viii

FEED for EPCIC of Power Generation and Distribution systems at Ughelli East Field

(OML 34)

Front-End Engineering Design (FEED) for actualization of an independent optimal Power Generation and Distribution

Solution required for Ughelli East field.

Study for installation of Gas engine powered generator with dual sources of fuel gas and back-up from an emergency diesel engine powered generator. Including studies for alternative power via the Transcorp 33kV Power line and Review of Existing Power System Equipment for Obsolescence and Possible System upgrade

FEED

(Front End Engineering Design)

 

 

 

 

 

 

 

 

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

 

June 2021- Sept. 2021

Completed

 

 

5

 

Frame Agreement Contract for Engineering Studies and Design

Engineering Services agreement for call-up contracts

FA

Total Upstream Nigeria Limited

(Deep Waters District)

 

 

Jun 2020 – May 2023

Completed

 

 

 

 

 

 

6

Technical Assistance – Drafting Services in Support of TUPNI DW ECP Group

Call-up Contract for Drafting and Technical Services to update COMPANY drawings according to mark-ups

ESA

Total Upstream Nigeria Limited

 

Oct. 2010 – Mar 2011

 

 

 

 

Completed

 

 

 

 

 

 

7

Engineering Design Service Agreement for Various MPN Projects (ESA III)

Provision of Engineering Services in performing Conceptual, Preliminary and Detailed Engineering, Integrity Management, Project Engineering Support, Procurement Technical Support and Construction/Installation Support Services.

ESA

Mobil Producing Nigeria Unlimited

 

Nov 2016 – Nov 2019

 

 

 

 

 

Completed

i

UNIUYO Engineering Complex Project

Detailed Architectural and Engineering Design for Engineering complex

2-floor Engineering complex and1 Stand Alone Workshop at the main campus of University of Uyo

DED

Mobil Producing Nigeria Unlimited

 

April. 2018 – July 2018

Completed

ii

Integrated Facility Mgt Project–Phase 2

Facilities Baseline Data Development

SECTION 2

Data development and As-Built

Mobil Producing Nigeria Unlimited

 

Mar. 2018 – Aug. 2018

Completed

iii

BRT Exposed Pipeline Remediation

Hydrological Study for BRT Exposed Pipeline Remediation

Hydrological Studies

Mobil Producing Nigeria Unlimited

 

Mar. 2018 – Aug. 2018

Completed

iv

JV Fire Water Piping Upgrade Project – Edop and Ubit Platforms

The project scope covers the engineering and design of the Firewater Piping Upgrade to replace the existing carbon steel and GRE firewater piping system that is risk ranked by Company for replacement with Copper Nickel (CU NI) in EDOP and UBIT Complexes.

Detailed Engineering Design

Mobil Producing Nigeria Unlimited

 

Jan. 2019-Sept. 2019

Completed

v

JV Structural Repair Project for Inim, Enang and Utue Platforms

Brownfield Verification of Corroded structural members for Inim, Enang and Utue Platforms

Brown Field verification and Production of Bill of materials for Construction

Mobil Producing Nigeria Unlimited

 

Dec. 2017 – April. 2018

Completed

   

   STAND ALONE ENGINEERING DESIGN SERVICE AGREEMENTS BY KOHASA ENGINEERING COMPANY LIMITED

S/N

Project

Description

Contract Type (ESA, EPCM, etc.)

Client

Period of Execution

Comment (Completed/Ongoing)

1

Manpower Supply for SOJAY Automations Projects

Manpower Supply for SOJAY Automations Projects

 

 

MPS

Sojay Automations Limited

 

 

April 2024

Dec 2024

 

Contract Ongoing

 

2

Provision Of Engineering Design Services For SNG (Pure Services) Asuro Project

Provision Of Engineering Design Services For SNG (Pure Services)

EDS

Shell Nigeria Gas Ltd (SNG)

Sept 2024

Sept 2025

 

Contract Ongoing

 

 

 

 

 

 

3

 

Detailed Engineering Design (DED) And Installation Engineering of Boat Landing Replacement Project.

Detailed Engineering Design (DED) And Installation Engineering of Boat Landing Replacement Project for OML 100 IME (IMD1) Platform.

DED

Total Exploration & Production Nigeria Limited/

Ponticelli Nigeria Limited

 

Dec 2022- Jan 2023

 

 

 

Completed

 

 

 

4

Frame Agreement for Engineering Services

(OML 58 Upgrade Phase 1 Project)

Provision of Engineering Personnel for the detailed Engineering of Obite Treatment Centre, Obagi Flow Station, Ogbogu clusters.

ESA

SAIPEM contr. Nig. Ltd/ Total Exploration & Production Nigeria Limited

July 2009 – Dec 2015

Completed

 

 

 

 

 

 

5

Provision of Engineering Design Service Agreement for OML 18

Provision of Engineering Design Service for various work packages on OML 18 for Two Years

Engineering Design Services

Agreement (ESA)

Eroton Exploration & Production Company Ltd.

 

Aug. 2020 – July 2021

Completed

 

 

 

6

 

Engineering Design Service Agreement for OML 18

Provision of Engineering Design Service for various work packages on OML 18 for Three Years

ESA

Eroton Exploration & Production Company Ltd.

 

Jun 2016 – Jun 2019

 

 

Completed

 

7

Revamp of Hydrocyclone Skid and Retrofit of Instrument Air System for Higher Capacity

Detailed Engineering Design of modification of process cooling Medium (PCM) and Gas Automation System Erha FPSO

 

 

DED

 

LES Energy Services Limited

 

 

 

 

 

June 2023- Sept 2023

 

Completed

 

8

Effluent Treatment Plant Upgrade Intervention Project.

Detailed Engineering design for the bio-sludge dewatering design system (Equipment design packages/work packages delivery)

 

DED

Evomec Global Services Limited

 

 

June 2023-August 2023

 

Completed

 

 

 

9

Service Order for Subcontract of Detailed Engineering

Design For Crude Oil Custody Transfer Metering Improvement Project In

Soku

Detailed Engineering

Design For Crude Oil Custody Transfer Metering Improvement Project In

Soku

 

DED

 

True-Blue Energy Services Limited

 

June 2023 -Sept 2023

 

 

Project On-hold

10

Manpower Supply for Engineering Design

Engineering Personnel Secondment For Engineering Design- FEED & DED For Otakikpo Marginal Field’s Development

FEED & DED

Green Energy International Limited

Nov 2021- Oct 2023;

Completed

 

11

Engineering Design Long Term Agreement (LTA) for World Food Programme (WFP) a United Nations (UN) Division.

The World Food Programme (WFP) seeks to engage consultancy firms at the global and regional level shown below to help deliver its engineering and management services. WFP Engineering facilitates the oversight of engineering design and provides project management services as part of delivering its global assistance programmes

Engineering Design Services (EDS)

Long Term Agreement (LTA)

World Food Programme

Via Cesare Guilio Viola 68/70

Parco de’ Medici 00148 Rome

Italy

Jan. 2024 – Feb. 2026

 

 

Contract Ongoing

 

 

  

 CONCEPTUAL/FEASIBILITY STUDIES PROJECTS EXECUTED BY KOHASA ENGINEERING COMPANY LIMITED

 

S/N

Project

Description

Contract Type (ESA, EPCM, etc.)

Client

Period of Execution

Comment (Completed/Ongoing)

 

 

 

1

Diagnosis Of the Solidity of The Building Housing the Headquarters of The UNICEF Office In Ndjamena

 

Diagnosis Of the Solidity of The Building Housing the Headquarters of The UNICEF Office In Ndjamena

Flexibility Studies/Analysis

United Nations Children’s Fund (UNICEF)

   

 

 

Dec 2023-

March 2024

 

 

Completed

2

Conceptual Design for the upgrade of Oki-Oziengbe Flow station and construction of gas compression facilities and pipelines.

Conceptual Studies for the upgrade of Oki-Oziengbe Flow station and construction of gas compression facilities and pipelines

Conceptual Studies

ENAGEED Resource Limited “A Sahara Group Company”

April 2019-

Aug 2019

Completed

3

Cawthorne channel 1 to Cawthorne channel  2 Alternative Crude evacuation Pipeline Project

Provision of Conceptual studies and Front End Engineering Design

Conceptual Studies/FEED

Eroton Exploration & Production Company Ltd.

Feb. 2018

– May. 2018

Completed

4

Awoba-Krakama-Cawthorne channel 3 Alternative Crude evacuation Pipeline Project

Provision of Conceptual studies and Front End Engineering Design

Conceptual Studies/FEED

Eroton Exploration & Production Company Ltd.

Jan. 2018 –

May. 2018

Completed

5

Alakiri Associated Gas solutions Conceptual Studies

Provision of Conceptual Studies for Alakiri Associated Gas solutions

Conceptual Studies

Eroton Exploration & Production Company Ltd.

Nov. 2017 –

Dec. 2017

Completed

6

20 MW Natural Gas Cogeneration Power Plant Development at Amuwo Odofin, Lagos State, Nigeria

Feasibility Studies for 20 megawatts natural gas Power Plant

Conceptual Studies

BCH Sustainable Energy Partners

Sep. 2017 –

Dec. 2017

Completed

7

Engineering Design for Conceptual study and FEED for Alakiri NAG condensate Storage Tank facility

Provision of Feasibility study and FEED for Alakiri NAG condensate Storage Tank facility

Feasibility Studies/FEED

Eroton Exploration & Production Company Ltd.

Jan. 2017 –

April. 2017

Completed

 

ONSHORE/SWAMP ENGINEERING DESIGN PROJECTS EXECUTED BY KOHASA ENGINEERING COMPANY LIMITED

 

S/N

Project

Description

Contract Type (ESA, EPCM, etc.)

Client

Period of Execution

Comment (Completed/Ongoing)

 

 

1.

FEED for EGBAOMA Gas Processing Plant Firewater System Upgrade Project.

 

FEED for EGBAOMA Gas Processing Plant Firewater System Upgrade Project

FEED

(Front End Engineering Design)

 

PNG Gas Limited

Ayihaifle Ayah

 

 

 

Dec 2023 –

May 2024

 

Contract     Ongoing

2.

Detailed Engineering Design For Lact Units At Ogale Tie-In Manifolds In OML 11

Detailed Engineering Design For Lact Units At Ogale Tie-In Manifolds In OML 11

DED

Posidon Engery Service Limited

 

July 2024

October 2024

 

Contract Ongoing

 

3

FEED AND DED Of the New 6inch Lean Gas Supply Pipeline to Power Gas

FEED AND DED Of the New 6inch Lean Gas Supply Pipeline to Power Gas

FEED & DED

Platform Petroleum

May 2024

October 2024

 

Contract Ongoing

 

4

Basic Engineering For Gas Processing Plant

Basic Engineering For Gas Processing Plant

Basic Engineering

Frazenergy Limited

Sept 2024

Dec 2024

 

Contract Ongoing

 

5

Grand Tortoise Ahmeyim Project (GTA) Detailed Basic Engineering Study (FEED)-Onshore Part For The GTA Hub Gas Pipeline Development Project At The Gandon Power Plant (Saint Louis), Senegal

Grand Tortoise Ahmeyim Project (GTA) Detailed Basic Engineering Study (FEED)-Onshore Part For The GTA Hub Gas Pipeline Development Project At The Gandon Power Plant (Saint Louis), Senegal

FEED

(Front End Engineering Design)

Proseen Engineering & Consulting

 

March 2023

Completed

6

Basic Engineering Design of 10,000 Metric Tonnes of Liquefied Petroleum Gas (LPG) Terminal @ Okoroama, Okrika Lga, Rivers State

Basic Engineering Design of 10,000 Metric Tonnes of Liquefied Petroleum Gas (LPG) Dispensing Depot Terminal and Storage facilities are fed in product from ship unloading facilities and a new jetty.

Basic Engineering

Forelight Energy Solutions Limited

 

 

Jul. 2022 –

Oct. 2022

Completed

7

Piping Flexibility Studies FOR The

ISO butane station piping system

Piping Flexibility Studies FOR The

ISO butane station piping system in Cote d’Ivoire

Piping Flexibility Studies/Analysis

Proseen Engineering & Consulting

 

April 2022-

May 2022

Completed

8

Piping Flexibility Studies FOR The

Lion GPL Plant Study, SA At 100

MMSCFD

Piping Flexibility Studies for The Lion GPL Plant Study, SA At 100

MMSCFD in Cote d’Ivoire

Piping Flexibility Studies/Analysis

Proseen Engineering & Consulting

 

April 2022-

May 2022

Completed

9

Detailed Engineering Design Agreement for Eraskon Nigeria Limited Integrated Manufacturing Complex Facility Measuring 7.9 Hectares and Access Road,

Detailed Engineering Design Agreement For Eraskon Nigeria Limited Integrated Manufacturing Complex Facility Measuring 7.9 Hectares And Access Road, Located At Obunagha, Yenagoa Local Government Area {LGA), Bayelsa State, Nigeria

DED

Erasko Energy Limited

Keme Lemebri

Project Lead Erasko Energy Ltd.

 

Oct 2021-

Jan. 2022

Completed

10

FEED for Eraskon Nigeria Limited Integrated Manufacturing Complex

Front-End Engineering Design (FEED) for Lube Oil blending plant and filling lines, plastic blow moulding plant, chemical blending plant, tooth Brush manufacturing, raw materials and finished products warehouse, laboratory, control room, electrical room, storage tank farm, utilities, access road and appurtenances.

FEED

(Front End Engineering Design)

Eraskon Nigeria Limited/ Erasko Energy Limited

 

 

Dec. 2020 –

April 2021

Completed

11

Technical HSE Studies/Support for NAOC – 2

Update of status of Technical HSE documentation for Brass Terminal, Clough Creek Flow Station, & Obama Flow Station. Also carry out Technical HSE sessions, HAZID, HAZOP, Safety Integrity Level (SIL), QRA, FERA, Safety Case etc.

Technical HSE studies

 

Nigeria Agip Oil Company (NAOC)

 

July 2020 – June 2022

Completed

12

Engineering Services for Orubiri 7LS Line modification for Gas Lift

Provision of Detailed Engineering Service for Well 7LS line modification for Gas lift

Detailed Engineering Design

Eroton Exploration & Production Company Ltd.

Jun. 2019- Sept. 2019

Completed

13

Development of As-Built drawings of NGC Metering Station at Onne, Rivers State

Development of As-Built drawings (Process PFDs,    P & IDs, Piping Plot Plan, General arrangements e.t.c) of NGC Metering Station at Onne, Rivers State,

As-Built Development

Eroton Exploration & Production Company Ltd.

April 2019 – June 2019

Completed

14

Conceptual Design for the upgrade of Oki-Oziengbe Flow station and construction of gas compression facilities and pipelines.

Conceptual Studies for the upgrade of Oki-Oziengbe Flow station and construction of gas compression facilities and pipelines

Conceptual Studies

ENAGEED Resource Limited “A Sahara Group Company”

April 2019- Aug 2019

Completed

15

FEED for Alkiri AG solutions and Flare Elimination Project

Front End Engineering Design of Associated Gas solutions and Flare Elimination.

FEED

(Front End Engineering Design)

Eroton Exploration & Production Company Ltd.

Mar 2019- July 2019

Completed

16

Design for Installation of an XHP Separator at Alakiri Flow station

Provide a design solution for the routing of XHP gas wells from the Alakiri Gas plant to the Alakiri Flowstation for processing using an XHP separator to be relocated from CAWC 3 station

DED

Eroton Exploration & Production Company Ltd.

July. 2018 – Sept. 2018

Completed

17

Provision of Project Site management support for LACT Unit Installation

Provision of Project management support for LACT Unit Installation

Project Management

Eroton Exploration & Production Company Ltd.

Mar. 2018 – Jun. 2018

Completed

18

Cawthorne channel 1 to Cawthorne channel  2 Alternative Crude evacuation Pipeline Project

Provision of Conceptual studies and Front End Engineering Design

Conceptual Studies/FEED

Eroton Exploration & Production Company Ltd.

Feb. 2018 – May. 2018

Completed

19

Awoba-Krakama-Cawthorne channel 3 Alternative Crude evacuation Pipeline Project

Provision of Conceptual studies and Front End Engineering Design

Conceptual Studies/FEED

Eroton Exploration & Production Company Ltd.

Jan. 2018 – May. 2018

Completed

20

Alakiri Associated Gas solutions Conceptual Studies

Provision of Conceptual Studies for Alakiri Associated Gas solutions

Conceptual Studies

Eroton Exploration & Production Company Ltd.

Nov. 2017 – Dec. 2017

Completed

21

Project management and Support Services for Alternative Crude Oil Export system Pipeline Project (ACOES)

Provision of Project management for Alternative Crude Oil Export system Pipeline Project (ACOES)

Project Management

Eroton Exploration & Production Company Ltd.

Oct. 2017 – Dec. 2017

Completed

22

20 MW Natural Gas Cogeneration Power Plant Development at Amuwo Odofin, Lagos State, Nigeria

Feasibility Studies for 20 megawatts natural gas Power Plant

Conceptual Studies

BCH Sustainable Energy Partners

Sep. 2017 – Dec. 2017

Completed

23

LPG Extraction Plant Project (Pipeline Scope)

Detailed Engineering Design for LPG Extraction plant targeted at extracting LPG, Propane & Condensate Products from rich associated gas

DED

Green Energy International Limited/Lekoil JV,

Lambda gas Dynamics Limited

Sep. 2017 – April. 2018

Completed

24

Engineering Design Support for Procurement and Installation of Gas Lift System

Provision of Engineering Support for the procurement and Installation of gas Lift System for Alakiri and Cawthorne Channels Fields

Follow-On Engineering

Eroton Exploration & Production Company Ltd.

Aug. 2017 – Dec. 2017

Completed

25

Engineering Design for Conceptual study and FEED for Alakiri NAG condensate Storage Tank facility

Provision of Feasibility study and FEED for Alakiri NAG condensate Storage Tank facility

Feasibility Studies/FEED

Eroton Exploration & Production Company Ltd.

Jan. 2017 – April. 2017

Completed

26

Award of Contract for Consultancy Services for the Design of ADIM ABARIBA road, BIASE L.G.A in Cross River State

Provision Consultancy Services for the Design of ADIM ABARIBA road, BIASE L.G.A in Cross River State

DED

Ministry Of Niger Delta Affairs

Jan. 2017 – Mar. 2017

Completed

27

Award of Contract for Consultancy Services for the Design of Internal Road Network NKO, YAKURR L.G.A in Cross River State

Provision Consultancy Services for the Design of Internal Road Network NKO, YAKURR L.G.A in Cross River State

DED

Ministry Of Niger Delta Affairs

Jan. 2017 – Mar. 2017

Completed

28

Engineering Design for Gas Lift for Alakri, Orubiri, Cawthorne Channel and Akaso fileds

Provision of Detailed Engineering Design of Gas Lift for Alakri, Oribiri, Cawthorne Channel and Akaso fileds

DED

Eroton Exploration & Production Company Ltd.

Oct 2016 – December 2016

Completed

29

Escravos Export System Project

Provision of Detailed Engineering Design of the Chevron Nigeria Limited Escravos export system on the Escravos Tank farm facility

DED

Gramen Petroserve Nig Ltd./ Chevron Nigeria Limited (CNL)

odum@chevron.com

May 2016 – April 2017

Completed

30

Supply of various

Engineering

Personnel for SPDC

ODIDI Project

Provision of Engineering

Personnel (Process, Loss Prevention and Control, Stress Analysis Engineers) for ODIDI project

DED

Shell Petroleum Development Company of Nigeria Limited

/Desicon Engineering Limited

 

May 2016 – May 2017

Completed

31

MCC and Workshop Building , Meji Living Quarter Project

Detailed Engineering Design for Motor control Center and Workshop building of the Meji Living Quarter platform

DED

Chevron Nigeria Limited/WECO Eng. & Const Coy Ltd.

May. 2013 – Sep 2013

Completed

32

OML58 Fresh Water Network Improvement (Phase 1)

Detailed Engineering Design for OML 58, Obagi Flow Station Fresh Water network Improvement

DED

Vicbriggs Nigeria Ltd./ Total Exploration & Production Nigeria Limited

Jan. 2013 – Jun 2013

Completed

33

NOPL Project Control Building and Guard Houses.

Detailed Engineering Design of Northern Option Pipeline Project Control Building and Guard Houses.

DED

CICO construction Limited /SAIPEM Contr. Nig. Ltd/ Total Exploration & Production Nigeria Limited

Jan. 2013 – Dec 2013

Completed

34

24” Gas Pipeline from Ogbainbiri to OB/OB (Replacement of damaged sections)

Detailed Engineering Design for 24” Gas Pipeline from Ogbainbiri to OB/OB (Replacement of damaged sections)

DED

TOPLINE Ltd./ DAEWOO Nig. Ltd./ Nigerian Agip Oil Company (NAOC)

Oct. 2012 – May 2013

Completed

35

OML 58: OLO Flare tip replacement

Detailed Engineering Design of OLO Flare Tip replacement and Project Management.

DED

Asbury Intl. Ltd/Total Exploration & Production Nigeria Limited

Sep. 2012 – Nov 2012

Completed

36

OSV LewekTuckan Upgrade

Provision of Structural Engrg calculations and dwgs for the installation of Reel Hub Drive and Overboarding chute Base.

DED

Tilone Subsea/TOTAL Upstream

May. 2012 – Jul 2012

Completed

37

Flow Line Sectional Replacement at the East and West Corner of OGBOGU Flow Station

Detailed Engineering Design of Flow Line Sectional Replacement at the East and West Corner of OGBOGU Flow Station

DED

Total Exploration & Production Nigeria Limited

Jan. 2012 – Jun 2012

Completed

38

OML 58 Obagi F/S peco filter installation for GPS and old NPS

Basic Engineering Studies, for the installation of the PECO filter on each of the fuel gas lines to the five oil expedition pumps

FEED

Total Exploration & Production Nigeria Limited

May. 2011 – Jul. 2011

Completed

39

OML58 Compact Prover Installation at Rumuekpe Metering Station- Basic Engineering.

Basic Engineering Studies for 16” bi-directional Prover loop that was no-longer in operation and install a new Compact Prover with required appurtenances.

FEED

Total Exploration & Production Nigeria Limited

 

May. 2011 – Jul. 2011

Completed

40

OML58 OB 090 Temporary Retention Pit

Basic Engineering studies for Temporary Retention Pit used for the storage of drill cut with a 10,000m3 storage capacity.

FEED

Total Exploration & Production Nigeria Limited

 

Nov. 2010 – Jan. 2011

Completed

 

OFFSHORE/SUBSEA ENGINEERING DESIGN PROJECTS EXECUTED BY KOHASA ENGINEERING COMPANY LIMITED

S/N

Project

Description

Contract Type (ESA, EPCM, etc.)

Client

Period of Execution

Comment (Completed/Ongoing)

1.       

OML 99-Boat Landing Replacement Project Located on AMD2/AMQ Platforms In OML 99 Field.

-Structural Engineering Design for AMD2 and AMQ Boat landing.

-Buoyancy studies

-Scaffolding Design

Detailed Engineering Design

Delattre Bezons Nig. Ltd (DBN)/ Total Exploration & Production Nigeria Limited

March 2020 – May 2020

Completed

2.       

OML 102 – OFP1 North East (NE) boat landing replacement

Detailed Engineering Design, Shop Fabrication and Installation engineering of OMl 102 NE boat landing replacement

Detailed Engineering Design

Ponticelli Nigeria Limited/Total Exploration & Production Nigeria Limited

Jan. 2020 – Mar. 2020

Completed

3.       

OML 99 Pig Receiver Drain Pan Overboard Scaffold Design

Detailed Design for Overboard Scaffold Design for Pig Receiver Drain Pan on OML 99

DED

Total Exploration & Production Nigeria Limited

Aug. 2017 – Oct. 2017

Completed

4.       

AFD1 13-ESDV-340 Scaffold Design

AFD1 13-ESDV-340 Scaffold Design

DED

Total Exploration & Production Nigeria Limited

Aug. 2017 – Sep. 2017

Completed

5.       

28-ES-3040 (A & B) Load bearing Scaffold Design

Scaffold Design Load bearing for 28-ES-3040

(A & B)

DED

Total Exploration & Production Nigeria Limited

May. 2017 – June 2017

Completed

6.       

Engineering Design of OML 100 (FSO Unity) Emergency RADA Works Scaffold Design

Engineering Design of OML 100 (FSO Unity) Emergency RADA Works Scaffold Design

DED

Total Exploration & Production Nigeria Limited

Feb. 2017 –April. 2017

Completed

7.       

Engineering Design of OML 102 (OFON) boat surfer landing scaffold

Detailed Engineering Design for of OML 102 (OFON) boat surfer landing scaffold

DED

Total Exploration & Production Nigeria Limited

Jan. 2017 – Mar. 2017

Completed

8.       

Implementation of Corrosion Inhibitor Injection on HP Production Header on AMD2 (phase 2)

Detailed Engineering Design for the Implementation of corrosion inhibitor injection on HP production header on Amenam Drilling platform 2.

DED

Total Exploration & Production Nigeria Limited

Sep. 2015 – Dec 2015

Completed

9.       

Conversion of Well AMKP2-40 from water injector to oil producer

Detailed engineering Design of AMKP2-40 as a water injector, connected to AMD 2 Water Injection manifold via 6” 1500# carbon steel flow line and replacement of Christmas tree with new oil production tree.

DED

Total Exploration & Production Nigeria Limited

Sep. 2015 – Dec 2015

Completed

10.    

Stress Analysis For Akpo Offloading Lines

Detailed Engineering studies of Piping Stress Analysis and Report For Akpo Offloading Lines

DED

Total Upstream Nigeria Limited

Jun. 2015 – Jul 2015

Completed

11.    

ANGO Pipelines Project

DED of Two wellhead platform with two dual string hook up arms & equipment

DED

CONOIL/MSI Africa Ltd.

/Greenstone Solution

Jan. 2015 – Apr 2015

Completed

12.    

UFR Package of EGINA FPSO

Detailed Engineering Design of UFR package in a joint team with Saipem.

DED

SAIPEM contr. Nig. Ltd/ Total Upstream Nigeria Limited

July 2013 – June 2015

Completed

13.    

OML 100 FSO UNITY OWT JASCON 1 Barge Stability Analysis

Detailed Engineering of barge stability and analysis to validate the stability of the JASCON 1 barge for the transportation of the FSO OWT module.

DED

Total E&P Nigeria Limited

May. 2013 – Jun 2013

Completed

14.    

MCC and Workshop Building , Meji Living Quarter Project

Detailed Engineering Design for Motor control Center and Workshop building of the Meji Living Quarter platform

DED

WECO Eng. & Const Co./  Chevron Nigeria Limited

May. 2013 – Sep 2013

Completed

15.    

EPC of Air Tugger Platform

Detailed Engineering Design of Air Tugger platform Skid on BE802 main deck

DED

TILONE Subsea/ Hallin Marine

Apr. 2013 – May 2013

Completed

16.    

Engineering for RDS Skids on vessel BE 802

Detailed Engineering Design for RDS Skids on vessel BE 802

DED

TILONE Subsea/ Hallin Marine

Feb. 2013 – Mar 2013

Completed

17.    

OML 100, FSO Unity Overboard Discharge Line Replacement with GRP

Detailed Engineering for OML 100 FSO Unity overboard discharge line replacement from Carbon steel to Glass Reinforced Plastic

DED

African Star Energy Services Ltd.

Feb. 2013 – Dec 2013

Completed

18.    

Mezzanine Deck Strength Assessment Services (vessel BE 802)

Deatailed Engineering design of mezzanine deck amendment on Vessel BE 802

DED

TILONE Subsea/ Hallin Marine

Jan. 2013 – Feb 2013

Completed

19.    

OML 99 AMQ Helideck Upgrade Project

Detailed Engineering for OML 99 AMQ Helideck Upgrade covering:        Preparation of Structural Engineering basis of design                            STAADPro model for analysis and design Design verification and reports.

DED

Asbury Intl. Ltd/Total Exploration & Production Nigeria Limited

Feb. 2012 – May 2012

Completed

20.    

OSV LewekTuckan Upgrade

Provision of Structural Engrg calculations and dwgs for the installation of Reel Hub Drive and Overboarding chute Base.

DED

Tilone Subsea/TOTAL Upstream

May. 2012 – Jul 2012

Completed

21.    

OML99 Lightning Protection Upgrade on AMQ and AMP2.

Basic Engineering Design Studies:

Provision of 2 point support of 2m (minimum)•Relocation of the existing ION Plasma generator on AMP2 above the highest structure on AMQ2 above the radar and the provision of lightning protection for the radar.

FEED

Total Exploration & Production Nigeria Limited

 

Aug 2011 – Sep. 2011

Completed

22.    

OML100 Re-instate Accessibility to South-East Boat landing on Edikan Drilling Platform1-EDD1

Basic Engineering Design Studies :

Relocation of existing boat landing on the southern East of the jacket to the North East corner of the platform at EL (+) 4.0m.

FEED

Total Exploration & Production Nigeria Limited

Apr 2011 – Jun 2011

Completed

23.    

Engineering for the Installation of Handrails, stoppers, and monorail with hoist at AMP1

Conversion of the North-West area of the weather deck on AMP1 to have additional storage space for chemicals and lubricants. storage area to be provided with steel drum storage with a capacity for the storage of 60 drums.

DED

Total Exploration & Production Nigeria Limited

 

Jan 2011 – Mar 2011

Completed

24.    

Design of an Air Cooled Heat Exchanger Structural support.

Design of an Air Cooled Heat Exchanger Structural support in IMA field Langley.

DED

CHESROC NIGERIA LIMITED

Dec. 2010 – Feb 2011

Completed

25.    

Design, fabrication, installation of Piping and total system integration of Agbani FPF

EPC of Agbani Compressor system. Floating Production Facility compressor packages.

EPC

Moni Pulo Limited

Jan. 2009 – Dec. 2011

Completed

 

INDEPENDENT AUDIT PROJECTS EXECUTED BY KOHASA ENGINEERING COMPANY LIMITED

 

S/N

Project

Description

Contract Type (ESA, EPCM, etc.)

Client

Period of Execution

Comment (Completed/Ongoing)

1

Payment For 3NOs Third-Party Auditors Carrying Out Operational Excellence Audit and Field-Based Implementation Training In OML 34 AMT

Payment For the engagement of 3NOs Third-Party Auditors for Six (6) months Carrying Out Operational Excellence Audit and Field-Based Implementation Training In OML 34 AMT

Pre-Start Up Audit & Manpower supply

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

 

November 2023 – April 2024

Completed

2

Pre-Start Up Audit for Replacement Of 10”X12KM Utorogu to UPS Pipeline Using Horizontal Directional Drilling (HDD)

Pre-Start Up Audit for Replacement Of 10”X12KM Utorogu to UPS Pipeline Using Horizontal Directional Drilling (HDD)

Pre-Start Up Audit

Nigerian Petroleum Development Company Limited (NPDC)/ND Western JV OML 34 Assets

 

Sept 2022

Completed

2

3

KPMG Advisory Services

Audit of in country steel Structure Fabrication and Galvanizing Capacity

Audit

KPMG Advisory Services

August. 2021 -September 2021

Completed

  

CONSTRUCTION/FABRICATION PROJECTS EXECUTED BY KOHASA ENGINEERING COMPANY LIMITED

 

S/N

DESCRIPTION

CONTRACT TYPE

CLIENT

PERIOD OF EXECUTION

Comment (Completed/

Ongoing)

1

Procurement, Fabrication, And Installation Of Orifice Flange Unions And Senior Dual Chamber Meter

Procurement, Fabrication, And Installation Of Orifice Flange Unions And Senior Dual Chamber Meter

FAHOL

 

Oct 2024

Dec 2024

Contract     Ongoing

2

Fabrication & Installation Of Automatic Sampling Units For Oloma And Imo River FS Project

Fabrication & Installation Of Automatic Sampling Units For Oloma And Imo River FS Project

Sojay Automations Limited

 

 

 

August 2024

Dec 2024

Contract     Ongoing

3

Obigbo FS Modification Of Obigbo FS Production To Ogale MF Via Auto Sampler

Obigbo FS Modification Of Obigbo FS Production To Ogale MF Via Auto Sampler

Heirs Energies Limited

 

 

Sept 2024

Dec 2024

Contract     Ongoing

4

Agbada 2 FS EP8 Process And Utilities Piping Installation Project

Agbada 2 FS EP8 Process And Utilities Piping Installation Project

Heirs Energies Limited

 

 

Sept 2024

Dec 2024

Contract     Ongoing

5

Provision of 7Tones

Marine Dead Weight

Construction of 7Tones Marine

Dead Weight.

 

TOTAL E&P Nigeria

 

Sept 2022 –

Dec 2022

 

 

Completed

6

Engineering, Procurement, Construction, and Installation of Flowlines.

Engineering, Procurement, Construction, and Installation (EPCI) of Flowlines System for OTAKIKPO WELLS 4 & 5

 

Green Energy International Limited          

 

Dec 2021

March 2022

 

 

 

 

Completed

7

Contract For the Construction and Installation of CPF Firefighting System For the 12mmscfd Liquified Petroleum Gas Extraction Plant

Construction and Installation of

CPF Firefighting System

Lambda Gas Dynamics

 

Nov.2021-

April 2022

 

 

 

Completed

8

Contract For the Fabrication and Installation Of Interconnecting Piping For The 12MMSCFD Liquified Petroleum Gas

Extraction Plant

Fabrication and Installation of Interconnecting Piping

Lambda Gas Dynamics

 

Nov.2021-

April 2022

 

Completed

9

LPG Extraction Plant Project (Pipeline Scope)

Engineering, Procurement

Construction, Installation (Piping, Pipeline, Electrical &

Instrumentation (EPCI)

 

Lambda Gas Dynamics/Green Energy International Limited

Dec 2018 –

May 2019

 

 

 

Completed

10

Laying of 6”x20 km Pipeline from Tuomo to Ogbainbiri F/S. Bayelsa and Delta State, Nigeria

Procurement, Pipeline laying and Cathodic protection

Nigeria Agip Oil Company

May-14

 

 

Completed

11

Fabrication of SMR.17.016A AND SMR.17.020 Pipe Support

Fabrication, NDT and Load Out

SPIE/ TOTAL Upstream Nigeria Limited

Sept 2018-

Oct 2018

 

Completed

12

EPCI of LACT Unit and Deck Extension for AWOBA Injection Manifolds.

Engineering Procurement

Construction Installation

(EPCI)

FODE/NEWCROSS

March 2018-

Sept 2018

 

 

Completed

13

Fabrication of Pressure Control Head StandFabrication of 1100HHP Stimulated Pump Grillage

Fabrication

Marine Platforms Limited

Dec 2016- Jan

2017

 

 

Completed

14

Fabrication of 4 Sets Vertical Guide Tube Camera Stands Structure

Fabrication

TOTAL Upstream Nigeria Limited (TUPNL)

Nov-2016- Dec 2016

 

Completed

15

Main Steel Works for Beneside Pipe Rack

Steel Fabrication

 

Shell Petroleum Development Company/Saipem Contracting Nigeria Limited

March 2015- Nov

2016

 

 

Completed

16

EPCI OF Buffer Storage Tank at Amukpe

Engineering, Procurement

Construction, Installation (

Tank, Piping, Platforms, Shelter

/ Shed, Electrical / instrumentation, Bundwall etc.

SEPLAT Petroleum Development Company Plc.

July 2014- June

2016

 

 

 

 

Completed

17

Fabrication of FRC Access Platform

Fabrication

Total Upstream Nigeria Limited (TUPNL)

Jan 2016- June

2016

 

 

Completed

18

24’’RapeleAmukpeTrunkline Sectional replacement project (Hot Tap)

Installation of Hot Tapping

Split tees

Seplat /Wellube / CCM Pipelines.

Feb. 2015- June

2016

 

Completed

19

Fabrication and Installation of Piping and total system integration of Agbani FPF

barge compressor packages. Nigeria

project management, procurement, fabrication / construction,

QA / QC

MONI PULO NIGERIA LIMITED

Stephen West D.

Nov.2010 –

August 2013

 

 

Completed

20

Meren I Compressor Controls Upgrade Electrical Works.

Electrical Installation and Commissioning

Chevron Nigeria Limited

April 2013 –

September 2014

 

Completed

21

Fabrication of PWD 18’’ Pig Launcher and 20’’ PIG Receiver

Project Management Procurement Fabrication / Construction QA / QC

CHEVRON NIGERIA LIMITED

Sept. 2012 –

September 2013

 

 

 

Completed

22

Fabrication of VCM Subsea Parking Structure

Steel Fabrication

Marine Platforms Limited

July 2014 –

Sept 2014

 

Completed

23

OML 100, FSO Unity Overboard Discharge Line Replacement with GRE

Engineering Fabrication

QA / QC

TOTAL E&P/African Star Energy

Services Limited

May 2013 –

December 2013

 

Completed

24

Fabrication of Clamps for

AKPO10 Permanent Clamps for Bend Stiffener

Fabrication

Total Upstream Nigeria Limited

(TUPNL)

Feb 2013 –

March 2013

 

 

 

Completed

25

Fabrication and Installation of Abiteye – Escravos 16” Gas Pipeline (Fabrication of process piping spools, pipe supports, Access platform and

miscellaneous

Steelwork structures.

Project Management Procurement Fabrication / Construction QA / QC

CHEVRON NIGERIA LIMITED

Sept. 2011 –

October 2012

 

 

 

 

Completed

26

Fabrication of PWD platform piles.

Project Management

Procurement Fabrication / Construction QA / QC

CHEVRON NIGERIA LIMITED

Sept. 2012 –

September 2013

 

 

Completed

Our extensive resume is comprised of over 3,500 projects completed

Our diverse project list includes engineering buildings and manufacturing structures